2015 |
Construction of the NJ05 large-scale injection molding machine with an increased production capacity of 250 tons/month and a total production capacity of up to 1,400 tons/month.
|
2013 |
Construction of the NJ04 large-scale injection molding machine with an increased production capacity of 300 tons/month and a total production capacity of up to 1,150 tons/month.
|
2008 |
Development of injection-molded pallets with improved equipment effectiveness and construction of the NJ03 large-scale injection molding machine with an increased production capacity of 250 tons/month and a total production capacity of up to 850 tons of pallets per month.
|
2006 |
The plastic pallets receive OHSAS18001 accreditation by the Bureau of Standards, Metrology & Inspection, Ministry of Economic Affairs
|
2002 |
The plastic pallets receive ISO-9001 (2000 edition) accreditation by the Bureau of Standards, Metrology & Inspection, Ministry of Economic Affairs.
|
1999 |
The pallet factory has a second die-casting machine added with a production capacity of 600 tons/month; the plastic pallets are accredited with ISO-14001 environmental management certification.
|
1998 |
Installation of the first die-casting machine with a production capacity of 300 tons/month; the plastic pallets are accredited with ISO-9002 quality certification.
|
1979 |
Preparations are made to build Chiayi’s 1st Factory.
|